]01[ the problem

The building is finished. What it is made of is in forty binders.

At handover the contractor delivers O&M manuals, drawings and a spreadsheet. The facility manager needs to know which valve feeds room 1DC1, when the air handlers need filters, what the lights on level 2 cost to replace and which of that is missing. The models the consultants drew already hold most of it. This page reads it straight from them.

3,162maintainable assets read from the architecture, HVAC, plumbing and electrical models, each placed in its room
…of them arrive without a manufacturer. The twin lists who owes the data before the final payment is released
…equipment tags appear in two discipline models at once, like AHU-1 in both HVAC and electrical: one asset, two records

]02[ the product

Twinton Handover: the as-built twin becomes the maintenance system

For the facility manager

Every asset with its tag, maker, model, room, system, expected life and cost, found by clicking the building or searching. Rooms know what is in them.

For the technician

Work orders on the phone that open on the asset in 3D: the filter to change on AHU-1, the emergency lights to test this month, the ball valve to close for a leak in a given room.

For the owner

The renewal budget by year from each asset's installation year, life and cost, and the maintenance hours the building will take, before the first year of operation.

For handover QA

Completeness of the handover data per field and per consultant, measured on the delivered models, so the gaps are closed while the contractor is still on the hook.

]03[ what is real on this page

RealSimulated
The building, its 260 rooms and 3,162 assets with the maker, model, life, cost, tag and system the models carry (buildingSMART Medical-Dental Clinic, CC BY 4.0)The handover date and the work order dates
Which room each asset sits in, from the geometryMaintenance frequencies (typical values, not a contract)
Completeness and duplicate countsTechnician names and ticks
Nearest ball valves to a room, by distance in the modelWhether that valve actually feeds the room (needs the pipe network traced)

]04[ price

A one-off handover, then a yearly operating fee

PILOT

€12,000

One building up to 15,000 m²: models read, assets placed in rooms, completeness report to the contractor, maintenance plan, eight weeks.

HANDOVER

€1.50 / m²

Per building at handover, minimum €15,000. Paid by the owner or written into the contractor's delivery.

OPERATE

€0.30 / m² / yr

The live twin with work orders, the phone app and renewal budget, minimum €6,000 a year per building.

Euro excluding VAT. The pilot fee is credited against the handover fee.

]05[ your building

Send us one building about to be handed over

Say what you have: IFC or Revit models, the O&M binders, the CAFM system you use. We answer within one working day.