$ twinton cost --project clinic

loading

twinton cost
Medical-Dental Clinic · cost plan… elements measured from five models · rates illustrative
model to money
Price
Cost plan
CASH FLOW BY COST GROUP, € THOUSANDS PER MONTHprogramme simulated

]01[ the problem

The model knows the quantities. The estimate is typed again by hand.

A cost consultant is paid for judgement and spends most of the fee on measurement. Every design revision means drawings measured again, a spreadsheet rebuilt, and a cost report that arrives after the design team has moved on. The consultants' models already hold every wall, door, duct and beam. This page measures a real clinic from its five models, prices it and shows what each design option does to the total, per line and in the building.

…elements measured into … priced lines: wall and slab areas from the model's own triangles, pipe and duct lengths, concrete volumes, steel tonnes from profile weights, counts of doors, fittings and lights
…construction cost at illustrative rates, … per m² over … of floor measured from the slabs. Put your own rates in and the plan follows
…that the saving options on this page take out, each priced from measured quantities and shown in the building before anyone agrees to it

]02[ the product

Twinton Cost: quantities from the model, judgement from you

For the cost manager

The cost plan by element group with €/m², each group clickable into the building, recalculated the moment a model is revised or a rate changes.

For the estimator

A bill of quantities with every line traceable to the elements it measured: click a line and they light up. Download it as CSV into your estimating system.

For value engineering

Options priced from real quantities: ceilings, steel sections, rated walls, duct runs, plus the steel price and labour index. The total and the building update together.

For the client

The monthly spend and the peak month from the programme, the budget with contingency, and the change in cost per line when a revision lands, before the variation is signed.

]03[ what is real on this page

RealSimulated
Every quantity: areas from the triangles of each wall, slab, roof and ceiling; lengths of pipes, ducts, rails and members; volumes of footings and foundation walls; counts (buildingSMART Medical-Dental Clinic, CC BY 4.0)Unit rates: illustrative € rates for supply and fit, meant to be replaced by yours
Steel tonnes from the kg/m in the W profile names and the SJI table for the joistsThe programme that spreads cost over months, and the 7 % contingency
Floor area from the measured slabs; which beams have a duct or pipe through themRate differences behind the options, and the share of rated walls in the third option

]04[ price

Priced per project, or for the practice

PILOT

€10,000

One project measured from your models, your rate library and element groups loaded, every revision re-measured for six weeks.

PROJECT

€0.50 / m²

Gross floor area, minimum €5,000, every model revision to tender measured and priced. A 20,000 m² hospital wing is €10,000.

PRACTICE

€72,000 / yr

Every project in one office, your rate library kept current, client links to the live cost plan.

Euro excluding VAT. The pilot fee is credited against the first year of the practice licence.

]05[ your project

Send us one model you are about to price

Say what you have: IFC or Revit models, the estimating system you price in, the element groups you report by (NRM, BSAB, SfB). We answer within one working day.