$ twinton prefab --project clinic

loading

twinton prefab
Medical-Dental Clinic · MEP prefabrication… shop modules from the HVAC and plumbing models · dates simulated
shop to site
Price
Status
SHOP BOARD, MODULES PER STATIONdates simulated

]01[ the problem

The prefab shop is ready. The drawings it cuts from are not.

An MEP contractor with a prefab shop wins its margin when ductwork and pipes arrive on site as racks and kits that go up in a day. It loses it when a module is cut from a model that still clashes with a beam, when the shop does not know which module the site needs next, and when a truck arrives with the wrong floor. This page cuts a real clinic's HVAC and plumbing into shop modules and follows each one from the detailer's desk to the ceiling it hangs in.

…of the clinic's duct and pipe metres (… measured from the model, above the slab) fall into … modules that can be made in the shop
…modules contain an element from one of the 182 clashes found in the delivered models. They cannot be released to the saw until the clash is closed
…truck loads, four corridor racks or ten kits each, planned in the order the site hangs them. … modules slip when a clash closes late (simulated dates)

]02[ the product

Twinton Prefab: one twin from the detailer to the ceiling

For the prefab manager

Every module in one board: detailing, held by a clash, cutting, assembly, pressure test, on the road, installed. The late ones are listed with the clash that made them late.

For the detailer

Click a module in the building and get its parts list from the model: pipe by system and size in metres, duct by size, fittings and valves. Download it as CSV for the shop system.

For the shop floor

Today's cut list on a tablet: every length in millimetres with its IFC id, ticked off as it is cut. The lengths come from the model, not from a drawing retyped.

For logistics and the site

Loads planned per delivery day in install order, the weight of each lift, and the site foreman's list of what to hang today and what arrives in the next three days.

]03[ what is real on this page

RealSimulated
The clinic, every duct, pipe, fitting and valve in its HVAC and plumbing models (buildingSMART Medical-Dental Clinic, CC BY 4.0)The shop dates, the stations and the install day of each module
Lengths and sizes, measured from each segment's geometry and rounded to standard sizesWhen each clash is closed by the coordinator
The room each module hangs in, and the 182 candidate clashes between the delivered modelsLift weights (typical kilograms per metre for each system, plus the rack frame)
The cut: a 6 m grid per storey, a module where a bay holds at least 14 parts; the rest is fitted on siteTruck rule: four racks or ten kits, 24 t

]04[ price

Priced per project, or for the whole shop

PILOT

€14,000

One project: your models cut into modules with your rack and kit rules, parts lists into your shop system, the board for shop and site, ten weeks.

PROJECT

€1.20 / m²

Gross floor area of the building, minimum €12,000 per project. A 20,000 m² hospital wing is €24,000.

SHOP

€96,000 / yr

Every project through the shop, your templates, the tablets on the floor and the site app for your foremen.

Euro excluding VAT. The pilot fee is credited against the first year of the shop licence.

]05[ your project

Send us one project you want to prefabricate

Say what you have: IFC or Revit MEP models, the shop system you cut from, how you build racks today. We answer within one working day.

What you send is stored so we can reply; see privacy.